All articles

Why testing a charge point needs a different CSMS than operating one

  • ocpp
  • testing
  • csms

Many teams testing an EV charging station start with a CSMS they already have. This may be a development or staging instance of the production backend, an open source CSMS or whatever the integration team happens to run. That works for a while, but it reaches its limits when it comes to finding root causes for defects deeper inside the charger, or to setting up specific test conditions.

The reason is not that production CSMS are designed badly. Testing and operating a charger are different jobs, and the two backends are optimized for different things.

The asymmetry that decides the CSMS

The two sides of an OCPP connection do not face the same problem.

A charge point operator (CPO) knows what it is dealing with, or will be. It selects the charging stations it integrates, or has a sample available in advance for integration tests. It also knows its own certificate authority, the certificate chain it issues, and it decides which security profile(s) its CSMS offers. It can prepare for vendor specific extensions (e.g. custom DataTransfer messages) and the OCPP device model the station offers.

A charging station manufacturer does not know which CSMS its product will be operated at, so it cannot prepare for a specific backend. It has to accept certificate chains from operators it has never seen, and it has to support all three security profiles, because it cannot know which one a customer will use. Granted, it has some freedom in the implementation too, because the OCPP certification profiles do not require every defined function and the hardware also decides what can be implemented and what cannot. But a gap in the supported OCPP feature set often means a competitive disadvantage for the manufacturer.

In short, the CPO can often narrow the problem space. The manufacturer usually has to cover it completely. The migration of a station to a new CSMS is the same asymmetry, seen from the other end. There, the new CSMS operator has to accept whatever security profile and certificate chain the station already carries. That is the position the manufacturer is always in.

That is why the tooling differs depending on its use case. A CSMS that operates a known device fleet may deliberately implement a selective set of functions. A CSMS that has to test a station against unknown backends may not.

What a production CSMS is optimized for

A production CSMS is a system with paying customers behind it. That is what it is optimized for.

  1. It implements the use cases the operator actually uses, usually a subset of OCPP. That ranges from the security profile in use, through the station's configured authorization and transaction behaviour, to charging profiles for smart charging.
  2. It deliberately blocks, for example, the interfaces that could disturb live communication, because an unexpected or outright wrong command to a station with a vehicle currently charging has real consequences. Deliberately refusing a station's connection attempt contradicts the intent of a production CSMS just as much as challenging the station with corrupted or incorrectly signed software packages.
  3. If a software fix in the station takes a long time, or is not possible at all, workarounds in the production CSMS are accepted quickly. As mentioned, the customer experience and the billing of charging sessions are what matter. Over time, a production CSMS accumulates tolerance for station specific behaviour that is not correct, or was never precisely specified in the first place, but is already in the field. The alternative would be to degrade the charging experience.

Each of those decisions is right for day to day operation. They make it a poor instrument for testing a charging station, though.

In fairness, a production CSMS also takes on work a test CSMS can ignore completely, such as roaming over OCPI, Hubject connections, or payment and billing for charging transactions. That is additional complexity the production CSMS implements, which likewise does not contribute to testing a charging station.

What a test CSMS has to do instead

Now reverse each of those points.

Coverage. A station has to be tested against the full range of use cases it claims to support. Not just the subset one operator happens to use. That includes messages a production backend may never send, messages that got lost in the network, or corrupted software packages that the station is supposed to detect and refuse to install.

Insight below the messages. Reading OCPP frames is not enough. When a station does not connect at all there are no OCPP frames, and the answer is one or two layers further down, in the TLS handshake, in the WebSocket upgrade or in the subprotocol that was never agreed.

Control. This is the part a production CSMS deliberately does not offer. To find out how a station reacts, you have to be able to misbehave towards it on purpose:

  • answer a request with a wrong value, or with a payload that violates the schema
  • not answer at all, and let the station's timeout expire
  • delay an answer until the station moves on by itself, or resends the message
  • send the same message twice
  • close the connection at the most inconvenient moment and refuse the reconnect

None of that is acceptable in a production CSMS. All of it is required on a test bench.

Testing a charging station is more than OCPP

Everything so far is still OCPP. The larger point is that OCPP is only one axis of the problem.

A modern charging station is not an OCPP client with a contactor attached. It has an ISO 15118 stack talking to the vehicle, an RFID reader, a Bluetooth interface for commissioning, a local web UI or API, and often EEBus or Modbus toward an energy management system. Every interface pulled into the object under test increases the test surface, and with it the complexity, considerably.

Hardware belongs in the test as well. Does a fault in the ground monitoring, or an undervoltage on a single phase, turn into an OCPP StatusNotification or a SecurityEventNotification? That can be verified in the CSMS, but it cannot be triggered over OCPP.

Then comes orchestration. Some use cases collide, and which one wins sometimes depends on the capabilities of the hardware and the firmware. Can the station install a firmware update while a vehicle is charging, for example? If not, what does it do with the request? Does it defer the work until charging has ended, or does it refuse it? Both answers are defensible. The expected answer can again be verified in the CSMS, but the CSMS cannot start the charging session.

Other test cases cannot be triggered over OCPP either:

  • Does a certificate update survive a power cut halfway through, or does the station come back with no usable certificate and no way to obtain one?
  • Does a local reboot, triggered from the web UI, a Bluetooth app or a button on the device, report the correct boot reason after it comes back up?
  • Does that reboot end a running charging session with the correct stop reason, or with a default value?

The trigger for the test conditions sits outside OCPP here as well. The evidence arrives over OCPP in all three cases.

A test CSMS is one building block, not the whole bench

That leads to a clear conclusion. If testing a charging station spans OCPP, hardware, several further interfaces and triggers that a person applies by holding up an RFID chip, plugging in the connector or pressing a switch in a smartphone app, then no single tool covers it. A test CSMS serves one axis of it. Another instance has to coordinate the rest.

That also affects how a test CSMS should be built. It has to pass its data and its events to the layer above, so a bench can correlate an OCPP event with a power supply that a different tool switched off seconds earlier. A test CSMS that can only be operated through its own interface is a dead end in that architecture, however good that interface may be.

The requirement list is therefore short:

  • Cover the whole protocol instead of a subset.
  • Show the layers below the messages.
  • Allow deliberate misbehaviour.
  • Be readable by something else.

Where OCTT belongs

One tool has to be named at this point, because it appears to bring test CSMS capabilities with it. The Open Charge Alliance publishes the OCPP Compliance Test Tool (OCTT). It runs the official test cases against a charging station and acts as the CSMS while it does that. It is the reference for protocol conformance, and an official OCPP certificate is ultimately issued on the basis of a run at an OCA approved test lab.

On coverage, the first point of the list above, nothing comes close to OCTT. It implements every normatively required test case, structured along the certification profiles. Conformance to the standard is measured against them.

On control, the third point, the OCA states the scope itself, on the page of the tool: "OCTT is capable of executing predefined scenarios only. It is not a CS/CSSS or CSMS simulator." The list of deliberate misbehaviour above therefore sits outside what the tool is for. Sending a wrong value to the station, a response you hold back, a socket you close at a moment of your choosing. None of that is a predefined scenario.

That is not a defect in OCTT. It follows from the job the tool was created for. A conformance verdict has to be reproducible and comparable between vendors. An issued certificate has to be defensible. All three require a fixed set of scenarios and an (almost) binary result. Conforming to the standard or not, per test case. But that is not what a developer needs to know.

Developing an OCPP capable charging station is a different situation. When the station does not meet the conformance conditions, the question is not "pass or fail" but why the station behaves the way it does. A tool built to produce a final attestation cannot answer that, and it is not supposed to.

The difference also shows in how and when the two are used. A conformance run is an event, close to the end of the development cycle. It is prepared, booked, executed and reported. A development bench ideally runs permanently. Several people work on it every day, at the same time, on several connected stations. A tool licensed and sized around one system under test does not fit that. What is needed here is a CSMS that a whole team can use without anyone waiting for a slot, and that runs where the bench stands. Behind a company firewall if need be, or in a lab with no path to the internet.

One point from the architecture description the OCA published for OCTT supports the claim from the previous section. A single OCPP test tool cannot drive everything its test cases need. It needs further ways to interact with something that can plug in a connector, hold up an RFID token or change the state of the vehicle. The OCA arrives at the same conclusion: the CSMS side is only one part of the bench.

So OCTT and a dedicated test CSMS do not replace each other. OCTT answers whether an implementation conforms to the standard. A test CSMS you control yourself is what you need for everything before that, and for everything the predefined test cases do not cover.

What that looks like in practice

In EVSExplorer, misbehaviour can be configured deliberately. Per request auto responses answer a station's request with a payload you define, or leave it unanswered. An OCPP request can be sent with schema validation switched off, so a payload that violates the OCPP schema goes on the wire unchanged. Closing the socket and refusing what follows are two API calls that target specific failure scenarios such as a CSMS outage or a misconfigured firewall. Configure the EVSExplorer OCPP server deliberately to present the station with unexpected server certificates or an outdated TLS version, and check whether the station rejects the connection as expected and later sends a matching SecurityEvent.

The connection events record what happened below the messages: which security profile a session negotiated, which side ended it and why, and the reason an attempt was refused before it ever became a session. Sequence numbers of transaction events are surfaced as gaps, so a change of network interface, or a connection interruption that causes OCPP messages to be lost, is easy to spot.

Everything the interface can do is also available over the documented REST API, so a bench that coordinates several test systems can drive EVSExplorer automatically and read back the recorded messages and events. That answers the last item on the requirement list.

A test CSMS like EVSExplorer should integrate into as many test benches as possible. It handles many charge points at the same time, several people work on it in parallel, and it runs either in the cloud or on your own hardware inside your own network.